High temperature solenoid valve installed

1, the solenoid valve coil installation up, and maintain the vertical position, the solenoid valve arrow or mark should be consistent with the flow of the pipeline shall not be installed in a splashed water or water leaks 2, the solenoid valve working medium should be clean without particulate impurities, electromagnetic Valves on the surface of the dirt and filters, to be regularly cleaned. 3, in the solenoid valve failure, in order to isolate the solenoid valve in a timely manner, and to ensure the normal operation of the system, it is best to install the bypass device 4, in the pipeline system, installed in the branch on the solenoid valve diameter should be less than the main pipeline valve The way to. 5, before installing the solenoid valve, the pipeline must be clean. It is advisable to install filters in front of the valve and steam traps to install traps. 6, the valve can not be installed in the pipeline depression, so as to avoid steam condensate, impurities and other precipitation in the valve and impede the action. 7, can not be used in explosive dangerous situations. 8, in the case of inadequate pipeline rigidity, it is recommended to pre-valve pipe with a fixed bracket, so as to avoid vibration caused by the solenoid valve work. 9, before installation, pay attention to see the product signs, read the manual carefully to determine whether the product meets the conditions of use. 10, before and after the solenoid valve to be installed on the pipeline pressure gauge in order to observe the pipeline pressure.

Accessories

Wenzhou Deli Machinery Equipment Co., Ltd. , https://www.sungoodtech.com