We
have got 220kV Transmission Line Substation Structure Quality Certificate from Power
Industry Steel Tower Qualified Inspection & Test Center from 2001
year. Our products are made from quality sheet through bending,
forming, automatic welding and hot galvanization. We can reach one-run
machining length of 14m and can bend sheet of thickness up to 45mm. We
adopt advanced welding procedures, automatically weld main joints and
reach rank-II welding quality. Substation Structure, Substation Steel Structure, Steel Tubular Substation Structures, Steel Structure For Substation Jiangsu Xinjinlei Steel Industry Co., Ltd. , https://www.jinleisteelpole.com
It is understood that the 200,000 standard cubic meters per hour coal hydrogen production plant is also an important supporting project of the Maoming Petrochemical Refinery Expansion Project. Compared with the conventional dry gas hydrogen production process, the coal-to-hydrogen slurry hydrogen production process of a coal hydrogen plant can save costs by 20 % to 25%.
Maoming Petrochemical starts to build the largest coal hydrogen plant in China
A few days ago, the single hydrogen production unit with the largest capacity in China started construction in Maoming Petrochemical. This device uses the most mature coal gasification technology in the world to convert coal or coke raw materials into hydrogen. This technology has been successfully applied by Jinling Petrochemical, Qilu Petrochemical, and Nanhua Company under Sinopec.