Jungle adveneture is a kind of Outdoor Expansion. Steel structures are replaced by trunk in the jungle. Outdoor expansion is a challenging project suitable for individual outdoor and team building activities, usually composed of high and / or low projects. Low altitute projects mainly refer to projects built on the ground. High altitude projects are usually built on trees (steel structures), and players need safety protection devices. Jungle Adventure,Jungle Adventure Play,Jungle Adventure Park,Forest high ropes course HANGZHOU JOY TECHNOLOGY CO., LTD. , https://www.joyplaypark.com
Matters for the installation and use of trash buoys
The construction process and methods of the construction of the pollution prevention buoy , the construction preparation, the construction personnel shall enter the construction site at the prescribed time, set up the material shed and living area, purchase and transport materials into the site, connect the power supply, and rent a boat. The pollution prevention buoy is made of plastic, anti-corrosion, anti-ultraviolet and anti-aging, environmental protection and no pollution. The pontoon material is made of polyethylene PE material, filled with polyurethane foam material. When installing, use stainless steel wire rope to pass through the hole reserved in the middle of the float, and the installation is more convenient. After the pontoon has been used for many years and the damage situation occurs, the damaged pontoon body can also be quickly and independently removed for easy maintenance and replacement.
During the construction process, all construction personnel are organized to hold a pre-work safety meeting before work every day during the construction process, so that all construction personnel are aware of the construction tasks of the day and are concerned about the safety that may occur during construction Accidents and corresponding countermeasures should be taken for analysis, so that you have a clear mind. In order to ensure the safety of human life and equipment during the construction process, the following regulations are specially formulated. As long as the ship transport vessel holds a certificated operation, the construction equipment on the ship must have fire prevention measures, rescue equipment, and electric tools are carefully checked before use, and unqualified tools are prohibited. , Must be equipped with protective equipment, use good anti-contact measures. Gas cutting operation The oxygen and acetylene bottles must be placed correctly and at a sufficient safety distance, and the operators must have corresponding qualifications. Welding operation The shell of the welding machine must be reliably grounded, the switch board must be installed with leakage current, and the welding wire must not be exposed. The operator must have corresponding qualifications. Working at heights When using a vertical ladder, you must use a fall arrester and wear a seat belt. For high-altitude operations, safety belts and tool bags must be used in accordance with the regulations. It is forbidden to throw tools or materials up and down. On-water operations When operating on the water, a charter boat operation is required. The operator must wear a life jacket.
The overall manufacturing and installation of the pollution prevention buoy is constructed according to the installation drawing of the pollution prevention buoy. During the installation period, a vessel is rented for installation and connection. The steel rope upstream of the pollution prevention buoy is fixed at the right bank wire rope fixing place of the right bank about 130 meters from the generator inlet. The downstream of the steel wire rope of the pollution prevention buoy is fixed at the fixed position of the gate pier on the left side of the water inlet of the generator. The color of the pollution prevention spool is factory-used. The yellow is the warning color. If you still need the words, you can get local advertisements. Company conduct word. In this retrofit of pollutant discharge, 100 sets of buoys are purchased in advance, and each buoy is 1 meter in length. In the future, buoys can be added depending on the operating conditions and effects.