Plastic Big Chair Mould

Model NO.: RNCM-150111311
Runner: Hot Runner
Design Software: UG
Installation: Semi Fixed
Standard: DME
Name: Chair Mould
Design Time: 2-3 Days for 2D/3D Drawing
Logo Changeable: Available
Back Changeable: Available
Core&Cavity Steel: P20 or 718
Approximate Mould Weight: 8 Tons
Hot Runner Brand: Chinese Brand Hot Runner with High Quality
Cooling System: Water Cooling with Excellent Cooling Effect
Special Service: Weekly Report and Machining Photos Available
Sample Time: 2 Months
Trademark: REMO
Transport Package: Wooden Case
Specification: SGS certified
Origin: China
HS Code: 8480710090
Plastic big Chair Mould

As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Plastic Big Chair MouldPlastic Big Chair MouldPlastic Big Chair MouldPlastic Big Chair Mould
Name  Description    
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.    
Mould Material  45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc    
Mould Base  LKM, HASCO ect.    
Cavity  Single/multi    
Runner  Hot/cold     
Mould Design 3D/2D Drawing    
Design Days  3 days    
Design Software  UG, PROE, CAD, CAE, CAM, CAXA ect     
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect     
Mould Life  300, 000-3, 000, 000 shots     
Injection System Pin-point-gate    
Polish System Mirror Polish    
Payment 40% of Deposit by T/T, 60% of Balance by T/T    
Delivery Time  15-60days     
Specification  Depends on customers requirements     
Business Step 
1. R& D We support customer R& D. Make the files or improve the design if you needed 
↓ ↓ ↓
2. Quotation Making Mould Quotation will be finished in 1 day according to information we get
↓ ↓ ↓
3. Negotiation  The quality, price, material, delivery time. payment item. ect 
↓ ↓ ↓
4. Mould Design  3-5 days for mould and product 3D/2D drawing design
↓ ↓ ↓
5. Mould According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days 
↓ ↓ ↓
6. Mould Testing When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference.
↓ ↓ ↓
7. Sample shoot  If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory 
  ↓ ↓ ↓  
8. Delivery  Delivery goods by sea or by air, according  customers requirement 

Mechanical Chain Type Scraper Conveyor

Zhangjiagang Liyuan Conveyor Machinery Co.,Ltd , https://www.zjglyssjx.com