The main part structure and function of XCMG Chusheng Wrecker

The main part of the structure and function of XCMG Chusheng Wrecker The top of the XCMG Chusheng Wrecker is fully hydraulically operated. Its power comes from the chassis engine. The PTO takes power from the gearbox window. The output power of the engine passes through the transmission. The shaft reaches the double toothed pump. Double pumps output high pressure oil, flow through multiple directional valves and various types of hydraulic valves, and then reach each actuator. The movement of each component is controlled by the reversing valve handle. The operating handle is arranged on the rear of both sides of the left and right toolboxes. Each side of the operating handle can realize full-function operation. The sign on the side of the operating handle clearly indicates the purpose and direction of operation of the control handle.

XCMG Chu Sheng Wrecker Vehicle Main Structure and Function

The sub-frame is the basis for the installation of the individual components. It can evenly distribute the concentrated load of each component on the chassis frame, improving the stress condition of the chassis. When lifting, the load is transmitted directly to the legs.

The supporting arm is the main part of the Xigong Gongchusheng wrecker involved in the rescue work. The lifting and pulling of the failed vehicle is mainly achieved through the supporting arm. With the help of the telescopic movement of the hydraulic cylinders, the supporting arm can be folded and lifted. , tilting and telescopic movements to complete various obstacle rescue missions

1, the main role of the leg is to support the ground when lifting and twisting the accident vehicle, in order to improve the stability of the vehicle and prevent the overload of the Xiagong Chu Sheng Wrecker. Outrigger legs have toothed legs and flat feet to accommodate different ground conditions.


2. The body kit is divided into two parts: the toolbox in the front of the car body is used to store all kinds of operational accessories and spare parts for the XCMG Chusheng Wrecker. The toolbox on both sides of the rear of the vehicle body is the space where the hydraulic joystick is installed.

3. The jib assembly is a component of the lifting accident vehicle. It is installed on the sub-frame and can complete lifting and telescopic wait. The jib can complete the operations of lifting, twisting, and turning over the accident vehicle with the winch.

4. The siren is the component that installs the siren. It lifts the warning light over the top of the cab, warning the front and rear vehicles and pedestrians.

5. The job attachment is a tool to complete various obstacle rescue operations. It can handle different vehicles in different forms.

Fukuda Road Wrecker

Dongfeng Duolika dragged two flat wreckers

Xiagong Chusheng (Hubei) Special Purpose Vehicle Co., Ltd. is a research, development, manufacturing, sales Chusheng brand wrecker, tanker, Dongfeng tanker, Foton tanker, liberation tanker, sprinkler, Sanitation Truck Garbage Trucks, Garden Sprinklers, Dongfeng Sprinklers, Fire Sprinklers, High Pressure Cleaning Vehicles, Concrete Mixers, Cement Mixers, Refuellers, Oil Tankers, Sewage Suckers, Garbage Trucks, Sucking Waste Trucks, Bulk Cement Trucks , powder material vehicles, truck crane trucks, truck cranes, coach vehicles, led advertising vehicles, flatbed trucks, excavator trucks and other special vehicles, a total of seven series of more than 200 varieties of wholly-owned private enterprises It is a member of Dongfeng Company, FAW Group, CNHTC Group and Beiqi Futian Company. It covers an area of ​​150,000 square meters, construction area of ​​100,000 square meters, more than 560 employees and more than 180 engineering technicians. More than 300 sets of equipment (sets), of which there are advanced flexible sealing device and the front end of the tank head and 8 × 9000 electronic control digital display machine, 9 m puzzle automatic welding machine, Germany Burger large displacement double screw air compression machine, PLC controls wind circulatory machine peening rooms, water spinner spray booths, drying rooms and machining, punching plasma cutting machines and other leading domestic equipment and tooling molds and testing instruments, with a total capital of more than 90 million yuan. Strong technical force, advanced inspection methods, and perfect products have won wide acclaim from users for their high quality and low price, reliable performance, and timely service.

Electric Motorcycle For Adult

City Electric Motorcycle,Electric Motorbike For Adults,Electric Motorcycle For Adults,Long Range Electric Motorcycle

Wuxi Jiangyin Xufeng Electric Bicycle Co., Ltd. , https://www.relxride.com