PHE Spare Plate For Thermowave Phe Plate For Thermove,Thermove Phe Plate,Plate Heat Exchangers,Phe Heat Exchangers Plates Dongguan Runfengda F&M Co., Ltd , https://www.runfengd.com
Water Ripple Roof Panel Roll Forming Machine Manufacturers
Why USÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Â
Parameters of  Water Ripple Roof Panel Roll Forming Machine Manufacturers
Item
Specification
Material
Type
Pre-painted steel coil & galvanized coils
Thickness (mm)
0.4-0.6
Yield strength (mpa)
235-345
Roller material
45#Chrome steel
Forming speed(m/min)
About 15
Out put speed
0-4m/min
Speed adjusting mode
ACÂ Frequency
Roller drive                                              Â
Decelerating motor + Chain drive
Cutting mode
Hydraulic cutting
Cutter materialÂ
Cr12 mold steelÂ
Length measurement
Encoder
Control mode
Mitsubishi PLC
Operating mode
Button + Mitsubishi Touch screen
Main motor power (kw)
7.5 kw (Depend on final design)
Hydraulic station powerÂ
2.2 kw (Depend on final design)
Total power (kw)
9.7Â kw
Uncoiler's loading capacity
Max. Capacity: 5000kgs (can be increased to be 10T)
Wholw line install size
About 18*1.7*1.6m (Depend on final design)
Components of Water Ripple Roof Panel Roll Forming Machine Manufacturers
Decoiler
1set  Â
Feeding & guiding device
1set
Main roll forming machine
1set
Pressing device
1set
Hydraulic cutting system
1set
Controlling system
1set
Run out tableÂ
1set  Â
Process flow:
Decoiler -- Feeding & Guiding -- Roll Forming-- Pressing--Hydraulic Cutting - Product to Run Out Table
Certifications                                       Â
FAQÂ Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â
Q1:When your factory extablished?Â
A1:Â We extablished since 2003, team with engineers who have 20 years experience in metal forming machine industry. We produce machine all-in-house, from raw material to ready machine, all done in our factory, so that we can control our machine quality and delivery time.Â
Q2:How long does it take to deliver the machine after the order & deposit?
A2:Usually it will take 50-60 working days to manufacture the machine and make it ready to deliver. At first 15 days the technical drawing will be made. The second 25 days start manufacturing the parts and ready to assemble. In the last 20 days the machine will be assembled and inspected to make sure it is ready to deliver.
Q3:What is your warranty term?
A3:Machine warranty time is 12 months. We supply life time service for our produced machines for all customers.Â
Q4:Can you offer oversea service?
A4:Yes,we have experienced technicians who can be sent to different countries to install our machines and supply others service .
Factory                                            Â
Â