Progress phase: Construction under construction (simultaneous EIA) Project Profile: The project is located at the intersection of Sanhuan Road and Xuefu Road in Nangang District of Harbin City (the Harbin Cable Plant Reconstruction Plot 3 and Plot 4). The project is located at Dong Yi Dao Street, Xuefu University, south of the planned Third Ring Road and west of Xu Captive. North of Hejiang Erdao Street, the project has a total land area of ​​52,969 square meters and a total construction area of ​​227,389 square meters, of which: 189,389 square meters of above-ground construction area, 38,000 square meters of underground construction area, the main content includes 11 19--33 high-rise buildings, There are 812 parking berths, the green space rate is greater than 30%, and the plot ratio is 2.14%. At the same time, it is equipped with comprehensive public welfare service facilities. It is expected that the project will accommodate 1,800 passengers upon completion. Construction Unit: Heilongjiang Kunlun Real Estate Development Co., Ltd. Postal address: 110 Nanji Street, Daowai District, Harbin City Post code: 150020 Design institute: Heilongjiang Institute of Chemical Industry (EIA) Very Narrow Aisle Racking,Narrow Aisle Pallet Racking,Narrow Aisle Racking Systems,Very Narrow Aisle Pallet Racking Nanjing Chinylion Metal Products Co., Ltd , https://www.clrack.com
Construction period: March 2011 - March 2015 Major equipment: firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc.
The total investment of the project is 723 million.
Contact: Liu Jing Telephone
Postal address: No. 540, Xinyang Road, Daoli District, Harbin, China Postcode: 150078
Contact: Lu Min Telephone
Impression Times Construction Project
Project Name: Impression Times Construction Project (March 2011 - March 2015, 723 million)
Related Developments: Tower Crane Infrastructure Project