At present, all teams have entered the state of welding construction. According to the company's requirements and the professional characteristics of the welding team, the safety precautions during the construction period are now issued to each team, and safety is strictly implemented. Safety inspections are carried out against the site to ensure safety and no accidents. ,Specific requirements are as follows: 1. This year's El Niño phenomenon is more serious. According to the notice of the National Defense Commission to prevent the occurrence of floods and floods in the Yangtze River, all units should strengthen measures such as flood control and wind prevention measures, flood control and wind drills to ensure safe production. To this end, each team of the welding track team should coordinate with the project department and pay attention to the following matters: (1) Pay close attention to the flood warning and weather forecast of the construction site and make the corresponding registration records; (2) Further inspection of the welder, generator and toolbox and the fixed joint of the flat plate, and strengthen the fixing measures to prevent the damage of the heavy rain and rain on the flat plate and the container; (3) If there is strong storm, the welder must stop construction and return to the base to avoid danger; (4) During the construction stop of the welder, the flatbed should be equipped with anti-mite measures to ensure the safety of the flatbed. (5) During the construction period, all safety measures of the project department must be put in place and emergency plans should be established. 2, anti-shock requirements: (1) During the construction operation, the connection of the generator shall be disposed of by a special electrician, and no one may access or reject it without authorization; (2), the living area uses electricity, the project department has arranged the wires, and no one can privately pick up the mess; (3) Each team leader shall check the wire sockets in the living area. If there is any damage or short circuit, an electrician shall be arranged to make corrections. No one may personally trim them; (4) The cables and wires of the construction machinery and welding machine and the wires of the terminal board shall be inspected before use. If aging or damage occurs, they shall be replaced or repaired immediately to ensure that the wires and cables are not exposed to electricity; 3. Fire protection requirements: (1) The welder and generator container should check whether the fire extinguisher device is complete and the fire extinguisher is out of date. If it is not complete or the fire extinguisher expires, it should be rectified immediately to ensure that the fire extinguisher is good; (2) Normalized equipment should be inspected for acetylene oxygen cylinders, acetylene oxygen tubes, valves, tempering devices, interfaces and pressure gauges during use to ensure that they are in good condition; (3) The use of normalizing equipment shall be specially staffed and shall not be adjusted at will; (4) In the process of welding and normalizing construction, set the windshield (box) according to the actual situation to ensure that the welding spatter and normalizing flame do not affect the surrounding safety; 4. Transportation requirements: (1) During the operation of the railcar or locomotive, the personnel of each team shall not move on the flatbed; (2), the small flat plate should check whether the brake system is intact, to ensure that the small flat plate is safe and reliable during the construction period, such as the lack of brakes, the small flat plate can not go online before repairing; (3) Motor vehicles should be driven by full-time drivers, others must not drive without permission, and must not drive on the road; (4) When the welding machine is working on site, anti-mite measures should be set before and after the flat plate and the wheel of the machine. It is recommended to cooperate with the team to set safety warning signs and full-time safety personnel before and after the construction section to ensure construction safety. According to the safety management system of the welding track team, each team leader is directly responsible. During the construction and production period, safety inspections should be strengthened, and one record should be rectified to ensure reliable production and control. Re-emphasizing that according to the charter responsibility letter signed at the beginning of the year, each team implements a safety one-vote veto system. It is hoped that each team will not be scorned on the safety issue. Otherwise, the relevant personnel will be punished and adjusted according to the welding team management method. Power washer short gun kit include one piece pressure washer short gun with 1/4`` quick disconnect socket, one piece 3/8'' quick connector, one piece M22-14mm fitting and one piece M22-15mm fitting.
1/4`` quick connector fits most turbo nozzle, surface cleaner, water broom, undercarriage cleaner, pivoting coupler, foam cannon, pressure washer sandblasting kit, gutter cleaner attachment and so on; it's good part for pressure washer equipment.
As this is a spare part for high pressure washer, please check and make sure it fits your machine . We don't take any responsibility for the incompatibility of the product. If you are not clear, please tell us, we will help to choose the suitable spare part.
Spray Gun,Pressure Washer Spray Gun,Power Washer Spray Gun,Pressure Washer Gun Ningbo Senmiao Trading Co., Ltd. , https://www.senmiaowasher.com
Short pressure washer gun has locking handle, offer you safe and convenient when you`re using it; Max temperature for water is up to 160℃ ( 320°F ).
Power washer handle gun`s body`s made of engineering plastic, the internal structure of the gun body`s stainless steel with high quality, offer firm&high wear resistance.
Welding rail team safety measures
Welding team each team: