Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck

Model NO.: 15AK
Trademark: huarui
Origin: Changzhou Jiangsu China
HS Code: 85159000
Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck
Binzel 15AK MIG Gas Welding Torch Consumables for Swan Neck
Item CO2 Swan Neck Compatible for  Binzel MB15AK Torch 
Type D1504,  Swan Neck 50deg
Packing  5pcs/bag
Certification ISO9001, CCC, CE, ROHS, TUV
Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck
Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck
Changzhou Huarui Welding & Cutting Co., LTD

Since the establishment in 1985, we have become one of the biggest manufacturers of welding and
cutting equipment and accessories in China by modern manufacturing equipment and special
technology.
 We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare
parts. With Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit
different kinds of foreign equipments.

1.MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius, Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab

Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck
Binzel 15ak MIG Gas Welding Torch Consumables for Swan Neck
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount you want.
For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark authorization
letter.

Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test, High voltage
test,
Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your confirmation or
Trade
Assurance Order Payment Link. You will be requested to do the pre-paid full payment before we go
into the
production. After we get the payment, we start to process the order. It usually takes 5-15days if we
don't have the
items in stock.



 

Other

Haoyi Model Factory , http://www.yy3dprint.com